Adding Labels for Steps and Lanes in a Salary Schedule

  1. From the Negotiations screen, select the Maintenance menu and then Salary Schedules.

  2. At the Salary Schedules screen, enter the ID of the package for which to add the labels in the Package ID field, or click the down-arrow button to select the correct one.

  3. The Salary Schedule - Amounts table for the specified package will display.

  4. Click the Edit tab; or if desired, double-click on a cell (step and lane) on the table instead to view the information specific to the particular cell and then continue with Step 7.

  1. Enter the number of the desired step to view in the Step field, or click the down-arrow button to select the correct one.

  2. Enter the number of the desired lane to view in the Lane field, or click the down-arrow button to select the correct one.

  3. Enter the description (up to 34 characters) for the step in the Step Description field.  If the brackets or the number are deleted, the system will automatically add them back in and truncate the description to 34 characters (if 35 or more characters were entered).

  4. Enter the description (up to 34 characters) for the lane in the Lane Description field.  If the brackets or the number are deleted, the system will automatically add them back in and truncate the description to 34 characters (if 35 or more characters were entered).

  5. Click the Save button.

  6. Repeat Steps 5-9 until the descriptions have been entered for all the steps and lanes.

  7. When done, click the Salary Schedules tab to view the tables with the newly added labels for the steps and lanes.